file Boeing and NASA prepare for the assembly of the first SLS rocket

  • ??
  • ??'s Avatar Topic Author
  • Visitor
  • Visitor
7 years 3 months ago - 7 years 3 months ago #7367 by ??
Up, Up Up in 60 Seconds: Watch Rocket Test Stand Soar to 221-Feet Tall



Proof is in the Core as SLS pushes towards maiden launch
Last edit: 7 years 3 months ago by ??. Reason: Added link. Reset font.

Please Log in to join the conversation.

  • ??
  • ??'s Avatar Topic Author
  • Visitor
  • Visitor
  • ??
  • ??'s Avatar Topic Author
  • Visitor
  • Visitor
  • ??
  • ??'s Avatar Topic Author
  • Visitor
  • Visitor
7 years 1 month ago - 7 years 1 month ago #7868 by ??

Published on Feb 22, 2017:

"NASA engineers conducted their first RS-25 test of 2017 on the A-1 Test Stand at Stennis Space Center near Bay St. Louis, Mississippi, on Feb. 22, continuing to collect data on the performance of the rocket engine that will help power the new Space Launch System (SLS) rocket. Shown from the viewpoint of an overhead drone, the test of development engine No. 0528 ran the scheduled 380 seconds (six minutes and 20 seconds), allowing engineers to monitor various engine operating conditions. The test represents another step forward in development of the rocket that will launch humans aboard "Orion deeper into space than ever before". Four RS-25 engines, together with a pair of solid rocket boosters, will power the SLS at launch on its deep-space missions. The engines for the first four SLS flights are former space shuttle main engines, which were tested extensively at Stennis and are some of the most proven engines in the world. Engineers are conducting an ongoing series of tests this year for SLS on both development and flight engines for future flights to ensure the engine, outfitted with a new controller, can perform at the higher level under a variety of conditions and situations. Stennis is also preparing its B-2 Test Stand to test the core stage for the first SLS flight with Orion, known as Exploration Mission-1. That testing will involve installing the flight stage on the stand and firing its four RS-25 engines simultaneously, just as during an actual launch. The Feb. 22 test was conducted by Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the prime contractor for the RS-25 engines. Syncom Space Services is the prime contractor for Stennis facilities and operations."


"Orion deeper into space than ever before?" I would be happy if NASA just sends people back to the Moon. It has been 45 years. I am tired of waiting. :evil:
Last edit: 7 years 1 month ago by ??. Reason: Changed text. Reset font.

Please Log in to join the conversation.

  • ??
  • ??'s Avatar Topic Author
  • Visitor
  • Visitor

Featured Article Of The Week:

Click Here To View Article / Video / Enhanced Images

YouTube User:  WhatsUpInTheSky37 

Thank you to everyone who has stuck by the YouTube channel and to all of our admins and forum users here on the channel.   They really have kept the website current while I have been busy taking care of things in my personal life.   I promised that the next video would be a long one and have a LOT to look at.  You can get lost in these Gigapans and I really hope that you do!  I spent a lot of time stitching these together and making sure that they were the best quality that I could get them.  SOL 1448 really has been a goldmine for anomaly hunters and those people who are just hobbiest.  I really hope you enjoy this one and expect much more to come from the latest batches of images!

top1top2top3top5
mid1
bot1bot2bot3bot4bot5bot6
verybot

 

Follow Us:

Logon: